+44 (0) 1332 343585

Correlation

Duration: 
3 Days 1/3 day assessment per delegate
Location: 
At our Derby training centre, or on your premises (subject to equipment availability)
Maximum number of delegates: 
6

Aim

This course is intended for signal design engineers who need to be able to perform correlation work.

 Key Features

  • Correlation process in accordance with NR/GN/SIG/11115 – Correlation of Signalling Records
  • All correlation activities can be rehearsed in a safe offline environment upon lifelike working equipment

Course Outcomes

On successful completion of this course, the delegate will be able to:

 ·       Identify the importance of Team Leadership and Roles

  • Make a safe Interface with the Working Railway
  • Create a Method Statement for correlation activities
  • Perform Condition Assessment and reporting
  • Perform Arrival at Work Site activities
  • Perform Inspection and Wire Counting of:
      • Locations
      • Equipment Rooms
      • Mechanical Signal Boxes
      • Control Panels (including Facia checks)
      • On-Track and Trackside Equipment
  • Perform Earth Busbar checks
  • Display Safe Working Practices
  • Record correlation Results
  • Perform Departure from Work Site activities

Assessment and Certification

Achievement of the Course Outcomes will be assessed by a practical and theory assessment.

The delegate’s achievement of the Course Outcomes will be confirmed by a certificate which will be forwarded to the nominated client contact following the course.

Pre-Requisites

A well prepared delegate is expected to be able to be able to understand wiring diagrams.